View Details
Bid Classification: |
Construction
|
---|---|
Bid Type: | Request for Proposals (multiple types) |
Bid Number: | RFP2019-018 |
Bid Name: | Bottom Wood Lake Road Improvements |
Bid Status: | Awarded |
Bid Awarded Date: | Thu Feb 20, 2020 (PST) |
Published Date: | Fri Dec 20, 2019 3:00:00 PM (PST) |
Bid Closing Date: | Wed Jan 22, 2020 2:00:00 PM (PST) |
Question Deadline: | Wed Jan 15, 2020 11:45:00 PM (PST) |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
Work Summary: Through this Request for Proposals, the District of Lake Country invites Proposals to perform comprehensive corridor improvement works in Lake Country, BC along Bottom Wood Lake Rd (Main St to McCarthy Rd) and Konschuh Rd. The scope of work for this project has 4 primary components and can be generally summarised as follows: 1. Utility, Road, and Intersection Improvements: • Full-length Watermain replacement, including fused HDPE beneath Middle Vernon Creek • Full-length Storm Sewer main construction, including installation of dry-wells • Full-depth road reconstruction • Construction of a new Roundabout 2. Streetlighting and Underground Electrical: • Installation and Commissioning of new Street Lights, including bases, conduit, poles, wire, etc. • Installation of ducting, vaults, junction boxes, etc. for undergrounding of BC Hydro, Telus, and Shaw overhead • Coordination with BC Hydro, Telus, Shaw, and Fortis BC during pole removal and commissioning of underground systems by others. 3. Culvert Replacement • Isolation and bypass of Middle Vernon Creek, including coordination with Environmental Monitor • Construction of CIP concrete footings and headwalls, including footing excavation and site dewatering • Construction of a new multi-plate arch culvert, including supply and coordination with manufacturer representative • Removal of existing corrugated steel culvert • Backfill and channel construction 4. Landscape Restoration and Improvements • Creek bed and channel restoration • Habitat restoration replanting • Additional aesthetic landscaping works • Minor Irrigation system relocation and improvements Substantial Performance for all Work must be achieved no later than October 2, 2020. Note: the Contract placed as a result of this RFP will be the MMCD (Master Municipal Construction Documents) 2009 Unit Price Contract, which includes the supplementary conditions detailed in Part C of this RFP. Full details of the work and how to submit a proposal are contained within the attached RFP documents.
|
Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. |
Categories: |
Show Categories [+]
|
Meeting Locations
The following are the meeting times and locations for the bid:
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.